Porcelain Tub Roll On Refinishing
|
STEP-3A
APPLY GLAZE Follow written Instructions closely
If you have applied a Slip-Grip bottom, roll the glaze right over it!
APPLY TUB GLAZE AROUND PERIMETER OF TUB FIRST
4 ROLLER MUST REMAIN WET WITH GLAZE AT ALL TIMES DO NOT APPLY PRESSURE TO ROLLER OR DRY ROLL
START APPLYING GLAZE ON BACK WALL OF TUB 5 USE DIFFERENT MOTIONS FOR DIFFERENT AREAS OF TUB ROLL TOP EDGE AND OUTSIDE FRONT LAST
WHEN FINISHED ROLLING LEAVE ROOM FOR 20 TO 30 MINUTES 6 WHEN DRY TO TOUCH CAREFULLY REMOVE MASKING TAPE This is a good time to be getting your tools cleaned up and getting ready to calk the tub. 7 CAREFULLY REMOVE TAPE FROM DRAIN AN OVERFLOW COVER
PROCEED TO CAULK
© SPR Product Sales 2012 |